(754) 206-8021Mon–Fri: 8 AM–11 PM, Sat–Sun: 7 AM–11 PM
Northstar Cooper City Epoxy Flooring
Dark concrete floor has irregular pale patches and glossy reflections in a mostly empty room.

Concrete floor stripping & removal in Cooper City FL - a clean slab, tested and ready

Old tile, glue or a worn coating standing between you and a new floor? We take it up and leave bare concrete ready to test.

Get your old floor off the right way

Call (754) 206-8021 or use the form, because the county paperwork and the slab's drying time both come before your new floor, and an early look keeps your project from sitting idle.

Request an estimate

What does it take to strip an old floor off concrete in Cooper City?

Concrete floor stripping and removal in Cooper City takes old tile, glue or a worn coating off your slab, down to bare concrete, so a new coating or other floor can go on. Pulling the old floor up is usually the quick part. The wait comes from the county's asbestos steps and from giving the bare slab time to dry.

Most people who call us at Northstar Cooper City Epoxy Flooring want a new garage, patio or shop floor, and something old is in the way. What you pay mostly comes down to how many square feet there are, what's on the slab now and how hard it's stuck, and some of that I honestly can't know until the concrete is tested. That's why I come look first, and your written estimate spells out the prep, the product and the finish so you can see what you're paying for.

Why Cooper City homeowners call us to take up old floors

  • The owner looks before anything moves

    I come out myself to look and test, and our own installers do the work. If there's a hard truth about your slab, you hear it from me at the estimate.

  • Doing slab prep since 2021

    We've been in business since 2021, based in Cooper City and working in the cities around it. Broward County's asbestos steps are part of how we plan a removal, not a surprise halfway in.

  • Licensed and insured, start to finish

    We're licensed and insured, so the risk of the job isn't sitting on you. The work is backed by our satisfaction guarantee.

On a removal, what's under the old floor decides everything after it, so tell me about your floor and I'll come take a look.

How we handle concrete floor stripping and removal

Before anything comes up, I look at what the old floor is and how old your house is, and we go over the county's asbestos steps with you before we set a start date. The county takes a statement of responsibilities for the asbestos work through its online permit system, then its staff review the project and send back a certificate listing your job's requirements, which can include a notification form, and county staff make follow-up inspections. When a job needs a permit, we take care of it with the building office before work starts, and if it isn't clear whether one is needed, we ask the office instead of guessing. You can check what your own project needs with the county's asbestos program. Then our installers take the old floor off down to bare concrete, and the slab gets tested before the new floor goes down, because a floor can come up clean and still be too wet to coat.

Once the slab is bare and ready, most homeowners move on to epoxy floor coatings for a garage or a room they use hard. For shops, warehouses and offices, we strip the old floor the same way ahead of commercial and industrial epoxy floor coatings, which are built for heavier traffic.

  • Tile and the glue under it

    This suits homes with old tile you're done living with, where the glue left behind matters as much as the tile. That glue has to come off too, or the new floor ends up stuck to old adhesive instead of concrete.

  • Worn or peeling coatings

    This suits garages and shop floors where an old epoxy or paint is lifting. Whatever's loose has to come off, because a new coating is only as good as what it's stuck to.

How do you know your old floor needs to come up?

  • Tiles cracked or sounding hollow

    When tiles crack or sound hollow when you tap them, the bond underneath has usually let go. Waiting tends to mean more broken pieces and more edges to trip on.

  • Coating peeling in sheets

    Old coating lifting near the garage door or under the tires usually means it never bonded to clean concrete. It keeps spreading the longer cars roll over it.

  • Old glue showing through

    Dark patches of glue where tile or carpet came up mean the slab isn't ready for anything new. Coating right over it usually means the new floor fails along with the glue.

  • White powder or damp spots

    A chalky white film or dark damp patches under old flooring often point to moisture coming up through the slab. Covering it again without a test just traps the problem under a new floor.

What happens after you call about floor removal in Cooper City?

  1. Call, then I come look

    I come out, look at the floor, test the slab and ask how you use the room, because that changes what goes down next. Then you get my written estimate.

  2. Clear the county, then remove

    Broward County lists a review time of up to one week for single-family homes, so we set your start date around it. Then our installers take the old floor off.

  3. Test the slab, walk it together

    When the slab is bare, I walk it with you and go over the moisture readings. That tells us whether your new floor can go down or the slab needs more drying time.

Questions about taking up old floors

These are the questions Cooper City homeowners ask me about stripping an old floor. If yours isn't here, call and ask, and I'll explain it as many times as it takes.

How much does tile removal cost in Cooper City?

Tile removal across the US usually costs about $3.10 to $5.60 per square foot, and that's a national going rate for taking tile up, not our price. Your own number moves with the square footage, what's under the tile and how well it's stuck, so I'd rather see the floor and put your figure in writing.

How early does Broward County need notice before a floor removal?

For renovations that fall under the asbestos rules, Broward County wants its submittals at least 10 working days before work begins. The state's environmental department also wants a notice at least 10 working days ahead for renovations that remove asbestos-containing material above federal thresholds, sent to its district or local program office. We build that wait in before we give you a start date.

Do federal asbestos rules cover my house in Cooper City?

Not for most houses, because the federal asbestos work practices leave out residential buildings with four or fewer dwelling units. The county still reviews single-family homes, with the review time in our steps above, so a Cooper City house can still go through county review.

How do I know when my slab is ready for a new floor?

Your slab is ready once the moisture inside it drops to an acceptable level for the floor you picked, because every flooring material has its own limit. Lay it too soon and that moisture can collect underneath and cause blistering, buckling, glue failure or mold, so plan on some drying time.

How long does a concrete moisture test take?

The standard in-slab humidity test can't be rushed, because the slab and the room air first need to sit at everyday living conditions for at least 48 hours. After that, each sensor in the slab needs 24 hours to settle before a reading can be recorded.

What causes high moisture in a concrete slab under old flooring?

High readings often come from outside the concrete itself, like poor grading, weak drainage, or gutters, vapor barriers or outside sealants that are missing or poorly installed. That's worth sorting out before you pick the new floor, because a slab that keeps getting wet will keep testing high.

Get a written estimate for your removal

Tell us the square footage, what's on the floor now and the floor you want next, and we'll reply within one business day. I come out and test the slab, then you get a free written estimate with no obligation.